| Critical Stages |
| 12' -Action |
21' -Flood |
24.5' -Moderate Flood |
28' -Major Flood |
|
| Stage: | 4.72 ft |
| Flow: | -999 kcfs* | | * Thousand cubic feet per second |
| 05/18/2013 05:00 pm | 5.6 |
| 05/18/2013 06:00 pm | 5.6 |
| 05/18/2013 07:00 pm | 5.6 |
| 05/18/2013 08:00 pm | 5.6 |
| 05/18/2013 09:00 pm | 5.6 |
| 05/18/2013 10:00 pm | 5.6 |
| 05/18/2013 11:00 pm | 5.6 |
| 05/19/2013 12:00 am | 5.6 |
| 05/19/2013 01:00 am | 5.6 |
| 05/19/2013 02:00 am | 5.6 |
| 05/19/2013 03:00 am | 5.6 |
| 05/19/2013 04:00 am | 5.6 |
| 05/19/2013 05:00 am | 5.6 |
| 05/19/2013 06:00 am | 5.6 |
| 05/19/2013 07:00 am | 5.6 |
| 05/19/2013 08:00 am | 5.6 |
| 05/19/2013 09:00 am | 5.6 |
| 05/19/2013 10:00 am | 5.6 |
| 05/19/2013 11:00 am | 5.6 |
| 05/19/2013 12:00 pm | 5.6 |
| 05/19/2013 01:00 pm | 5.6 |
| 05/19/2013 02:00 pm | 5.6 |
| 05/19/2013 03:00 pm | 5.6 |
| 05/19/2013 04:00 pm | 5.6 |
| 05/19/2013 05:00 pm | 5.6 |
| 05/19/2013 06:00 pm | 5.6 |
| 05/19/2013 07:00 pm | 5.6 |
| 05/19/2013 08:00 pm | 5.6 |
| 05/19/2013 09:00 pm | 5.6 |
| 05/19/2013 10:00 pm | 5.6 |
| 05/19/2013 11:00 pm | 5.6 |
|
|
| 05/18/2013 03:45 pm | 4.72 | -999.000 |
| 05/18/2013 03:30 pm | 4.72 | -999.000 |
| 05/18/2013 03:15 pm | 4.72 | -999.000 |
| 05/18/2013 03:00 pm | 4.72 | -999.000 |
| 05/18/2013 02:45 pm | 4.72 | -999.000 |
| 05/18/2013 02:30 pm | 4.72 | -999.000 |
| 05/18/2013 02:15 pm | 4.72 | -999.000 |
| 05/18/2013 02:00 pm | 4.72 | -999.000 |
| 05/18/2013 01:45 pm | 4.72 | -999.000 |
| 05/18/2013 01:30 pm | 4.72 | -999.000 |
| 05/18/2013 01:15 pm | 4.72 | -999.000 |
| 05/18/2013 01:00 pm | 4.72 | -999.000 |
| 05/18/2013 12:45 pm | 4.72 | -999.000 |
| 05/18/2013 12:30 pm | 4.72 | -999.000 |
| 05/18/2013 12:15 pm | 4.72 | -999.000 |
| 05/18/2013 12:00 pm | 4.72 | -999.000 |
| 05/18/2013 11:45 am | 4.72 | -999.000 |
| 05/18/2013 11:30 am | 4.72 | -999.000 |
| 05/18/2013 11:15 am | 4.72 | -999.000 |
| 05/18/2013 11:00 am | 4.72 | -999.000 |
| 05/18/2013 10:45 am | 4.72 | -999.000 |
| 05/18/2013 10:30 am | 4.72 | -999.000 |
| 05/18/2013 10:15 am | 4.72 | -999.000 |
| 05/18/2013 10:00 am | 4.72 | -999.000 |
| 05/18/2013 09:45 am | 4.72 | -999.000 |
| 05/18/2013 09:30 am | 4.72 | -999.000 |
| 05/18/2013 09:15 am | 4.72 | -999.000 |
| 05/18/2013 09:00 am | 4.72 | -999.000 |
| 05/18/2013 08:45 am | 4.72 | -999.000 |
| 05/18/2013 08:30 am | 4.72 | -999.000 |
| 05/18/2013 08:15 am | 4.72 | -999.000 |
| Flood Impacts |
| 28.0 | Excess overflow of water has damaged some sewer and water mains in the city of Oceanside. The Lilac Road Bridge on the Pala Indian Reservation has likely washed out. The Rincon Casino has been evacuated. Approaches to upstream crossings are likely damaged or washed out. North River Road has likely been undermined in Oceanside. The retainaing wall protecting homes in the Rancho Viejo project upstream from Oceanside is likely compromised. Pala Casino is at risk with possible evacuations. |
| 24.5 | Extent of damage unknown. It is possible that the approaches to several of the upstream crossings will be damaged or washed out. The Lilac Road Bridge on the Pala Indian Reservation is likely impassable. Undermining of North River Road in Oceanside is possible. Undermining of the retaining wall protecting homes in the Rancho Viejo project is possible. Businesses in the flood plain not protected by the levee are at risk of innundation, including the Pala Casino parking areas and the Rincon Casino itself. |
| 21.0 | Approaches to upstream bridges including Camino Del Rey, Shearer Crossing, and Couser Canyon, among others, are threatened and possibly damaged. The Lilac Road Bridge on the Pala Reservation is at risk. |
| Historical Crests |
Low Water Records |
1) 21.70 ft on 01/16/1993
2) 20.70 ft on 01/11/2005
3) 19.97 ft on 03/06/1995
4) 19.25 ft on 01/10/2005
5) 18.60 ft on 03/28/1979
6) 17.17 ft on 03/01/1991
7) 14.99 ft on 02/15/1986
8) 14.23 ft on 03/03/1983
9) 14.00 ft on 02/21/1980
10) 12.00 ft on 02/07/1937
|
1) 1.50 ft on 07/31/1999
|
Data provided by NOAA Advanced Hydrologic Prediction Service
|
|