« Back to Bayard Rivers

Tuscarawas River at Massillon

Critical Stages
14.5' - Action
18' - Flood
20' - Moderate
23' - Major

Latest Observation

Updated: 2:15 PM EST 12/10/25

Status: No Flooding

Stage: 7.56 ft

Flow: 0.0795 kcfs

Forecast

Forecast not available for this location.

TimeStage (ft)Flow (kcfs)
2:15 PM 12/10 7.56 0.0795
2:00 PM 12/10 7.56 0.0795
1:45 PM 12/10 7.56 0.0795
1:30 PM 12/10 7.56 0.0795
1:15 PM 12/10 7.56 0.0795
1:00 PM 12/10 7.56 0.0795
12:45 PM 12/10 7.56 0.0795
12:30 PM 12/10 7.56 0.0795
12:15 PM 12/10 7.56 0.0795
12:00 PM 12/10 7.55 0.079
11:45 AM 12/10 7.55 0.079
11:30 AM 12/10 7.54 0.0785
11:15 AM 12/10 7.53 0.078
11:00 AM 12/10 7.53 0.078
10:45 AM 12/10 7.52 0.0775
10:30 AM 12/10 7.5 0.0765
10:15 AM 12/10 7.5 0.0765
10:00 AM 12/10 7.49 0.076
9:45 AM 12/10 7.48 0.0755
9:30 AM 12/10 7.47 0.075
9:15 AM 12/10 7.46 0.0745
9:00 AM 12/10 7.45 0.074
8:45 AM 12/10 7.44 0.0735
8:30 AM 12/10 7.44 0.0735
8:15 AM 12/10 7.43 0.073
8:00 AM 12/10 7.43 0.073
7:45 AM 12/10 7.42 0.0725
7:30 AM 12/10 7.42 0.0725
7:15 AM 12/10 7.41 0.072
7:00 AM 12/10 7.4 0.0714
Hydrograph for Tuscarawas River at Massillon
24' - FEMA 0.2 percent flood level. Flood waters will spread onto Third Street.
23' - Properties on Ohio Street Southwest in Navarre flooded. Numerous roads between Canal Fulton and Navarre flooded including Route 21 and 62.
22' - FEMA 1 percent flood level. Significant flooding can be expected in many unprotected areas along the river.
21' - Flooding along the Tuscarawas River near Massillon will be confined to areas north of the levee protection in part due to backwater from Newman Creek. Portions of Route 21 and 62 flooded.
19' - U.S. Route 62 near Navarre inundated.
18' - Flooding begins in the Agathon Park area to Route 21. Water encroaches on Route 62 in Navarre. Flood waters may force the closing of two railroad crossings in Massillon.
16' - Community Park in Canal Fulton flooding. In Massillon, backwater possible along Newman and Plum Creeks. This could lead to minor road flooding along Lever Raod, High Street, Cherry Street, and First Street Northwest.
14.5' - Pumping stations along the levee system utlized.
DateStage (ft)
Feb 18, 2022 18.64

Data provided by the National Weather Service.