Vermillion River near Wakonda
Critical Stages
13' - Action
14' - Flood
15.5' - Moderate
17' - Major
Latest Observation
Updated: 6:09 PM LMT 12/31/00
Status: Obs Not Current
Stage: -999 ft
Flow: -999 kcfs
Forecast
Forecast not available for this location.
| Time | Stage (ft) | Flow (kcfs) |
|---|---|---|
| 11:45 AM 12/14 | 2.42 | 0.013 |
| 10:45 AM 12/14 | 2.43 | 0.0136 |
| 10:30 AM 12/14 | 2.41 | 0.0125 |
| 10:15 AM 12/14 | 2.42 | 0.013 |
| 10:00 AM 12/14 | 2.41 | 0.0125 |
| 9:45 AM 12/14 | 2.41 | 0.0125 |
| 9:30 AM 12/14 | 2.41 | 0.0125 |
| 9:15 AM 12/14 | 2.41 | 0.0125 |
| 9:00 AM 12/14 | 2.4 | 0.012 |
| 8:45 AM 12/14 | 2.4 | 0.012 |
| 8:30 AM 12/14 | 2.38 | 0.0118 |
| 8:15 AM 12/14 | 2.39 | 0.0119 |
| 8:00 AM 12/14 | 2.39 | 0.0119 |
| 7:45 AM 12/14 | 2.4 | 0.012 |
| 7:30 AM 12/14 | 2.39 | 0.0119 |
| 7:15 AM 12/14 | 2.38 | 0.0118 |
| 7:00 AM 12/14 | 2.37 | 0.0117 |
| 6:45 AM 12/14 | 2.37 | 0.0117 |
| 6:30 AM 12/14 | 2.37 | 0.0117 |
| 6:15 AM 12/14 | 2.38 | 0.0118 |
| 6:00 AM 12/14 | 2.38 | 0.0118 |
| 5:45 AM 12/14 | 2.36 | 0.0116 |
| 5:30 AM 12/14 | 2.36 | 0.0116 |
| 5:15 AM 12/14 | 2.36 | 0.0116 |
| 5:00 AM 12/14 | 2.36 | 0.0116 |
| 4:45 AM 12/14 | 2.38 | 0.0118 |
| 4:30 AM 12/14 | 2.36 | 0.0116 |
| 4:15 AM 12/14 | 2.34 | 0.0114 |
| 4:00 AM 12/14 | 2.35 | 0.0115 |
| 3:45 AM 12/14 | 2.36 | 0.0116 |
19.5' -
Water reaches the bottom of the bridge on 461st Avenue near Lodi, and the highest levees will be overtopped.
19' -
The intersection of Highway 19 and 46 begins to flood. The bridge on 302nd Street 1 mile east of Colfax Corner is overtopped.
18.5' -
The bridge on highway 19 near Lodi, and the bridge on 461st Avenue northeast of Colfax Corner, are both overtopped.
18' -
Water reaches the bottom of the bridge on 303rd Street between Lodi and Colfax Corner.
17.5' -
The bridge on 304th Street west of Dalesburg is overtopped. Water reaches the bottom of the bridge on Highway 19 at the gauge location.
17' -
Highway 19 south of Centerville is flooded. Water reaches the bottom of the bridge on 302nd Street east of Colfax Corner, and many of the levees will start to be overtopped with approximately 25000 acres flooded between Davis and Vermillion.
16.5' -
Hwy 19 north of the gage location begins to flood. Water reaches the bottom of the bridge on 461st Avenue northeast of Colfax Corner, and major flooding of agricultural land south of Davis begins.
16' -
Water reaches the bottom of the bridge on 304th Street west of Dalesburg, Highway 19 near 299th Street begins to flood, 302nd Street near Colfax Corner will be flooded, and approximately 10000 acres could be flooded between Centerville and Vermillion.
15.5' -
Water reaches the bottom of the bridge on highway 19 near Lodi, and 306th Street near Hub City will flood along with several other county roads.
15' -
Highway 19 south of Centerville could start flooding if the levees fail.
14' -
Minor flooding of low lying areas begins in non-leveed areas and some agricultural land will flood if the levees fail.
| Date | Stage (ft) |
|---|---|
| Jun 22, 2024 | 18.93 |
| Mar 15, 2019 | 18.11 |
| Jun 23, 1984 | 17.62 |
| Mar 17, 2010 | 17.6 |
| Jun 25, 2018 | 17.5 |
| Mar 20, 2011 | 17.38 |
| Apr 24, 1995 | 17.34 |
| Jul 7, 1993 | 17.33 |
| Apr 6, 1969 | 17.17 |
| Apr 26, 2001 | 17.11 |
| Jun 10, 2008 | 17.05 |
| Jun 22, 1983 | 17.03 |
| Jun 17, 2014 | 16.96 |
| Apr 1, 1960 | 16.94 |
| Mar 31, 1997 | 16.93 |
| Mar 28, 1962 | 16.75 |
| May 17, 2016 | 16.72 |
| Jun 13, 1947 | 16.63 |
| Mar 18, 2007 | 16.58 |
| Mar 25, 1979 | 16.57 |
Data provided by the National Weather Service.