« Back to Deerfield Rivers

Ohio River at Wellsville

Critical Stages
9' - Action
11' - Flood
14' - Moderate
16' - Major

Latest Observation

Updated: 7:03 PM LMT 12/31/00

Status: Obs Not Current

Stage: -999 ft

Flow: -999 kcfs

Forecast

Forecast not available for this location.

Observation history not available.

Hydrograph for Ohio River at Wellsville
31' - Water overtops the Corp of Engineers flood wall and water begins to flow into the town of Wellsville.
20.2' - Flood waters reach the levels of flooding from Hurricane Ivan of September 19, 2004.
18' - Water reaches the restaurant near the north end of the Lisbon Street Bridge.
16' - Little Yellow Creek reaches bankful at the Lisbon Street Bridge. This area is not protected by the flood wall and the installation of flood gates at the Corps of Engineers local flood protection project.
14' - Residential basements flood on Wells Avenue at the north end of town. This area is not protected by the flood wall and the installation of flood gates at the Corps of Engineers local flood protection project.
13' - The picnic pavilion at the marina on Little Yellow Creek begins to flood. This area is not protected by the flood wall and the installation of flood gates at the Corps of Engineers flood protection project.
11' - The parking lot of the marina outside the river wall begins to flood. This area is not protected by the flood wall and the installation of flood gates at the Corps of Engineers flood protection project.
9' - Pumping operations begin at the corps of engineers local flood protection project
7' - Preparations begin for activating pumps for local flood protection project
DateStage (ft)
Jan 20, 1996 20.9
Sep 18, 2004 20.2
Jan 6, 2005 16.7
Apr 4, 2024 14
Apr 13, 2024 10.4

Data provided by the National Weather Service.