« Back to Doran Rivers

Red River of the North at Wahpeton

Critical Stages
9.5' - Action
11' - Flood
13' - Moderate
15' - Major

Latest Observation

Updated: 3:30 AM CST 12/16/25

Status: No Flooding

Stage: 4.14 ft

Flow: 0.296 kcfs

Forecast

Forecast not available for this location.

TimeStage (ft)Flow (kcfs)
3:30 AM 12/16 4.14 0.296
3:15 AM 12/16 4.14 0.296
3:00 AM 12/16 4.14 0.296
2:45 AM 12/16 4.14 0.296
2:30 AM 12/16 4.14 0.296
2:15 AM 12/16 4.14 0.296
2:00 AM 12/16 4.13 0.294
1:45 AM 12/16 4.13 0.294
1:30 AM 12/16 4.13 0.294
1:15 AM 12/16 4.13 0.294
1:00 AM 12/16 4.13 0.294
12:45 AM 12/16 4.13 0.294
12:30 AM 12/16 4.13 0.294
12:15 AM 12/16 4.13 0.294
12:00 AM 12/16 4.13 0.294
11:45 PM 12/15 4.13 0.294
11:30 PM 12/15 4.13 0.294
11:15 PM 12/15 4.13 0.294
11:00 PM 12/15 4.13 0.294
10:45 PM 12/15 4.13 0.294
10:30 PM 12/15 4.13 0.294
10:15 PM 12/15 4.13 0.294
10:00 PM 12/15 4.13 0.294
9:45 PM 12/15 4.13 0.294
9:30 PM 12/15 4.13 0.294
9:15 PM 12/15 4.13 0.294
9:00 PM 12/15 4.13 0.294
8:45 PM 12/15 4.13 0.294
8:30 PM 12/15 4.13 0.294
8:15 PM 12/15 4.13 0.294
Hydrograph for Red River of the North at Wahpeton
22.5' - Top of the permanent dike.
18' - Close dike openings at Minnesota St (MN) and Dakota St (ND). Close dike openings at railroad bridge (requires removal of railroad tracks).
17.5' - RECORD FLOOD. Post-Diversion Flood of Record (March 24, 2009). Post-1900 Flood Flow of Record (10.4 kcfs on March 24, 2009).
16.5' - City mobilizes as patrolling of levees and storm sewer outlets begins.
16' - Wells Park floods. Flooding of a portion of the sanitary sewer system begins.
15' - MAJOR FLOOD. Wahpeton storm sewer outlets and Main Sreet closed.
13.5' - North Main Street and bridge closed (Breckenridge).
13' - MODERATE FLOOD. Start to put up flood wall (Breckenridge) if river is forecast to go above 15 feet.
12' - Storm sewer valves are closed and interior pumping begins (Breckenridge).
11.6' - Otter Tail River water starts to flow into the Breckenridge Diversion. Water on Main Street (Breckenridge).
11' - MINOR FLOOD.
9.5' - ACTION STAGE/FORECAST SERVICE STAGE.
8' - Otter Tail River starts to overflow downstream of Highway 75 bridge. This breakout flow will enter the Red River 600 feet downstream of the gage. As stage rises, water fans out and floods the entire east side of bottomlands.
7' - Close storm sewer outfalls.
DateStage (ft)
Apr 6, 1997 19.42
Apr 5, 1989 17.95
Mar 24, 2009 17.5
Jan 1, 1897 17
Apr 9, 2001 16.94
Mar 16, 2010 16.49
Apr 10, 1969 16.34
Apr 1, 2006 15.93
Apr 7, 2011 15.69
Jun 3, 2007 15.6
Apr 14, 1979 15.44
Apr 12, 1952 14.99
Mar 17, 1995 14.88
Mar 28, 1978 14.81
Apr 2, 1943 14.75
Apr 1, 2019 14.66
Apr 11, 1965 14.34
Mar 31, 1993 14.33
Mar 30, 1986 14.31
Apr 26, 2013 14.3

Data provided by the National Weather Service.