« Back to Finger Lakes Rivers

Genesee River at Mount Morris Dam

Critical Stages
720' - Action
760' - Flood
760' - Moderate
760' - Major

Latest Observation

Updated: 8:00 AM EST 12/6/25

Status: No Flooding

Stage: 587.47 ft

Flow: -999 kcfs

Forecast

TimeStage (ft)Flow (kcfs)
1 PM 12/6 587.2 -999
7 PM 12/6 587.2 -999
1 AM 12/7 587.2 -999
7 AM 12/7 587.2 -999
1 PM 12/7 587.2 -999
7 PM 12/7 587.2 -999
1 AM 12/8 587.2 -999
7 AM 12/8 587.2 -999
TimeStage (ft)Flow (kcfs)
8:00 AM 12/6 587.47 -999
7:30 AM 12/6 587.52 -999
7:00 AM 12/6 587.56 -999
6:30 AM 12/6 587.59 -999
6:00 AM 12/6 587.59 -999
5:30 AM 12/6 587.57 -999
5:00 AM 12/6 587.49 -999
4:30 AM 12/6 587.41 -999
4:00 AM 12/6 587.32 -999
3:30 AM 12/6 587.21 -999
3:00 AM 12/6 587.14 -999
2:30 AM 12/6 587.1 -999
2:00 AM 12/6 587.08 -999
1:30 AM 12/6 587.08 -999
1:00 AM 12/6 587.11 -999
12:30 AM 12/6 587.12 -999
12:00 AM 12/6 587.14 -999
11:30 PM 12/5 587.14 -999
11:00 PM 12/5 587.12 -999
10:30 PM 12/5 587.09 -999
10:00 PM 12/5 587.08 -999
9:30 PM 12/5 587.09 -999
9:00 PM 12/5 587.12 -999
8:30 PM 12/5 587.19 -999
8:00 PM 12/5 587.26 -999
7:30 PM 12/5 587.33 -999
7:00 PM 12/5 587.38 -999
6:30 PM 12/5 587.39 -999
6:00 PM 12/5 587.36 -999
5:30 PM 12/5 587.28 -999
Hydrograph for Genesee River at Mount Morris Dam
760' - Flood stage, capacity of dam is reached. Spillway utilized. Dam must release flow. Major flooding likely downstream all the way to Rochester area. Co-ordination necessary among affected agencies for possible evacuations.
720' - Action-alert stage. Pool significantly full. Increase monitoring.
600' - Conservation pool, June 15 to November 1, maintained as close to this level as possible.
584' - Pool elevation. Typical low level-uncontrolled.
575' - River bed elevation.
DateStage (ft)
Jun 23, 1972 755

Data provided by the National Weather Service.