16.52' - the river reaches the The bottom of the instrument shelter shelf.

16' - the river reaches the I-beams of the U. S. Highway 82 bridge.

15' - the river reaches moderate flood stage, flooding the approaches of U. S. Highway 82 1/2 mile east of the bridge, as well as lower structures at Wilbank Trucking, Inc.

13.51' - the river reaches the floor of the instrument shelter.

12.5' - the river reaches minor flood stage. Structures at Wilbank Trucking, Inc., located approximately 1/4 mile east of the gage, begin to flood.

12' - the river reaches bankfull. Overbank flooding occurs about 1/2 mile upstream from the gage and spreads onto the flood plain. As a result, river width increases to approximately 1 mile in some reaches. Minor flooding of low-lying areas occurs, but no significant damage is expected.