26' - The grounds of the pumping station begin to flood.
22' - Flooding reaches the lower concrete span of the bridge on Covered Bridge Road.
18' - Castleberry Road off NC-42 is flooded and flood waters approach the entrance to East Clayton Elementary School.
16' - Major flooding begins.
13' - Flooding will close the Neuse River Greenway trail.
10' - Upstream of the gage site, the Neuse River Greenway at Covered Bridge Road begins to flood.
9' - Minor flooding begins. Minor overflow occurs on both banks. Water reaches the edge of the Neuse River Greenway trail.