31' - The bridge on County Road 15 1 mile northwest of the gauge is overtopped
26' - The water reaches the bottom of the bridge on County Road 15 one mile northwest of the gauge, and SD Highway 28 at the Spink/Beadle county line floods.
25' - The bridge 2 miles east of the gauge is overtopped
24' - Water goes over the top of the bridge at the gauging location the highway between Mellette and Brentford floods
23' - The water reaches the bottom of the bridge 2 miles east of the gauge
22' - Moderate flooding of significant amounts of agricultural and wooded areas begins
21' - The water reaches the bottom of the bridge at the gauging location
20' - Flooding of low-lying agricultural and pasture land begins