407' - Major flood stage. Water gets onto North Gennesee Street between downtown Utica and the Thruway connector.
406' - Water gets onto Leland and Wurtz Avenues and reaches Canal Corp building. Part of Canal Corp parking lot is flooded.
405' - Moderate flood stage.
404' - Water overflows onto the wharf at the Utica Canal terminal. River Street in Oriskany is also flooded.
403' - Minor flood stage. Water reaches roads that cross the flats including River Street in Oriskany.
402' - Water is two feet from the top of the wall at the Canal terminal.
401' - Action stage.